English version with machine-assisted translation. Downloadable originals, audio and text embedded in images remain in their original language.

FENIX · primary document · DOCX

FENIX — Ideal Reference Model Builder. Document

A method for moving from a desired image to a working result profile: 19 directions, 13 profile fields and 20 checks. It distinguishes the image, requirements and actual data, and describes resources, responsibility and version updates; the benchmark applies to the work, not a person’s worth.

Editorial Board 1.0 · 2026-09-17 · Author's working concept 1.0; Discussion and agreement document

Full text of the main document, including tables. Visual design and images are preserved in the original DOCX.

Download original DOCX Copy with site address All 10 sources in one archive

Original: https://speczashchita.com/fenix/library/fenix-ideal-benchmark-document.docx

KNOWLEDGE AND ENERGY / PROGRAM MODULES OF PEOPLE'S SELF- DEVELOPMENT

FENIX

EVOLUTION SYSTEM

Builder
the Ideal Standard

From the image of the desired result
to verifiable and reproducible practices

VISION → REQUIREMENTS → PRACTICE → EVIDENCE → UPDATE

Methodology • 19 directions • 13 profile fields • 20 checks

Working concept 1.0 | 17 September 2026

The benchmark is set for the outcome, process, or conditions of participation. It does not determine the value of a person and is not a mandatory model of personality.

01 / APPOINTMENT

What the constructor creates

The designer of the ideal reference is the proposed module FENIX, which helps translate a personal or joint idea into a description of the result, available actions and an understandable verification procedure. His way out is not a beautiful image in itself, but a working passport with sources, resources and responsible.

Key rule

First, agree on what counts as a result and how to check it. Then act. After checking, keep both successful experience and limitations.

Parameter

Contents

Purpose

Preparation of a personal route, training module, practical project, process or site.

User

Participant, mentor, project manager, center curator and reviewer.

Sign in

Confirmed need, baseline, context and available resources.

Withdrawal

Passport M01-M13; criteria; route; evidence; protocol and standard version.

Status

A working concept, not an approved standard, license, certificate or government program.

Continuity

D01–D19 and P01–P13 from FENIX — Evolutionary System, v1.0, are preserved.

How to use the document

First, read the rules and rules of participation. Then select the object and direction, fill in 13 fields, make up criteria and pass 20 checks. Practical examples show how to separate intention from proven result. At the end, work forms and sources are placed.

The numbers, deadlines, examples of requirements and internal acceptance rules in this module are project proposals. Roles, venues, funding and application of specific methods are agreed separately.

02 / SYMBOL OF THE STONE

The ideal image is a guide, not a promise

“Ideal” in this concept means a clearly expressed desired quality in a certain context. This is not a statement about the existence of a single perfect solution for all people, territories and conditions. The working standard is selected according to the need and can be changed after verification.

Concept

Working value

Example

The perfect image

Qualitative description of the desired benefit without substitution by fact.

A person understands the energy of his own site.

Working Standard

Agreed requirements, limitations, criteria and methods for checking the version of the project.

Journal without unexplained omissions; reproducible calculation; specified restrictions.

Actual result

Observed data and performed work with date and conditions.

The journal is received; two lines require clarification; calculation is checked.

Regulatory requirement

A mandatory rule from an applicable source of law, checked separately.

The requirements for activity, security and data are not set by the project name.

Why it is important to distinguish the meanings

In metrology, the standard is associated with the implementation of the definition of magnitude, value and uncertainty. Here another term is used - "project result standard". The card FENIX does not create a state standard and does not certify the measuring system. [S03, S09]

Output boundary

"Complies with the version of the standard v1.0 in the described conditions" - an acceptable form of internal output. "Perfect in everything" and "suitable for any application" are not conclusions of this system.

03 / PERSON IN THE CENTER

The standard of conditions, not the people rating

The person chooses the target and the permissible load. The program can check the availability, security, support and quality of feedback; the work performed has specific requirements. Beliefs, dignity and the right to participate are not translated into an overall score of “ideal conformity”.

Saved 13 personal contours of the previous program. This is a selection menu, not a mandatory development ladder. In one cycle, one main and one supporting circuit is enough.

Code

Contour

Code

Contour

P01

Health

P08

Economics and financial independence

P02

Consciousness

P09

Family and communities

P03

Mind

P10

Creativity and culture

P04

Emotions

P11

Nature and Service to the Earth

P05

Skills

P12

Spirituality

P06

Education

P13

Meaning and mission of life

P07

Work and skill

—

—

Rules proposed to be fixed

The participant can refuse the task, change the goal, request an adaptation and exit. The personal route is closed by default; publication of the work and the name is agreed separately. It is not necessary to disclose medical history, family circumstances, political or religious views.

The check should explain what condition of work is not fulfilled and what help is needed. The phrase “insufficient data” is preferable to an unconfirmed conclusion about a person. Disagreement with the examiner is considered by the other responsible.

Three different signage systems

P01–P13 — personal contours. M01–M13 — Passport Fields. D01–D19 — Directions of practice. Matching the number of fields does not make these lists interchangeable.

04 / ARCHITECTURE

Three layers of one object

For each object, three related but separate layers are retained. The user always sees what was the intention, what was agreed to perform and what really happened.

Layer

What is stored in it

What is forbidden to replace

A. Image

Necessity; desired benefits; limitations; alternatives.

The desired effect cannot be attributed to what has been achieved.

B. Reference

Requirements; methodology; initial state; target values; deadline and responsible decision.

After receiving the result, the criterion cannot be changed imperceptibly.

C. Fact

Data; work done; costs; side effects; evidence; acceptance decision.

Missing data cannot be written as zero or success.

Design objects

The personal route describes the chosen skill. The training module describes the content, support and validation of the development. A practical project connects the result with the resources. The process sets a repeatable sequence of work. The site describes the conditions of use. The territorial task combines several projects without substituting their heterogeneous results with one number.

Connection with "Knowledge and Energy"

Knowledge answers the questions “what to do, why and how to check”. Resources answer the question “how to ensure action”. Separately recorded time and attention of a person, joint organizational work, electricity and heat. These values are not converted into each other by an arbitrary coefficient.

Short recording

Need → Image → working standard → Available Action → fact → check → next version.

05 / CYCLE

Eight steps and five stages FENIX

Step

Action

Withdrawal

1

Clarify the need and owner of the task.

One clear task and consent to participation.

2

Define the object and initial conditions.

Limit of application and initial description.

3

Describe the desired benefits and alternatives.

The image of the result without the promise of effect.

4

Set requirements and method of verification.

The operating standard before the test.

5

Check resources, law and security.

Decision on admission or list of obstacles.

6

Carry out limited practical work.

Journal, sample, actual costs.

7

Compare the fact with the requirements and the request.

Status for each criterion and limitation.

8

Save experience and agree on a new version.

Archive, change, repeat or complete.

Symbolic cycle of the program

Spark is the choice of task and image. Fire is learning, training and practice. Ashes - data analysis and rejection of a non-working. Ascension - repetition taking into account the comments and confirmation of the result. Flight is the voluntary transfer of proven experience. It is the language of the organizational model, not an assessment of the internal state of a person.

Transition condition

At the control point, the clarity of the task, the availability of resources and the security of the continuation are checked. Return to the previous step is allowed. When the boundaries, method or criterion are changed, a new version is created, and the original protocol remains available to the verifier.

06 / SINGLE PASSPORT

13 fields: meaning and requirements

Passports are consistent 13 sections from the previous program FENIX. In this module, the section M07 is revealed through three layers - image, working standard and fact. Detailed indicators are made by applications, so as not to overload the main card.

M01 / Identification

Name, code, version, date and status of the reference. How to distinguish this edition from the previous one?

Example: FEN-ET-D02-001 / v0.1 / project.

M02 / Need

Whose task is solved, what benefits are expected and how the request is confirmed. Is the result needed by the participant or just the organizer?

Example: Participants want to keep an energy log on their own.

M03 / Participants

Operator, task owner, executors, mentor and examiner. Who has the right to agree on the goal and who takes the job?

Example: Curator of the site; mentor; examiner, not the author of the calculation.

M04 / Borders

Object, territory, group, period, conditions of use and exclusion. Where the standard is applicable, and where the conclusion can not be transferred?

Example: One workshop; only reading permitted data; 12 weeks.

M05 / Directions

One Primary D01–D19, related directions and selected personal contours P01–P13. What links really change the project?

Example: D02; links to D09, D15, D18; personal areas P03, P05.

M06 / Knowledge

The necessary skills, sources, methodology, mentoring and rights to materials. Can I repeat and understand this instruction?

Example: Energy units; log; instruction; source cards.

M07 / Results

Ideal image, working standard, initial state and acceptance criteria. What exactly will be presented and what will confirm the achievement?

Example: Journal, reproducible calculation and explanation of constraints.

For a short project, a short answer in each field and a link to the application are enough. The empty field is marked as "not defined" and inapplicability is explained.

07 / SINGLE PASSPORT

13 fields: execution and acceptance

M08 / Plan

Steps, deadlines, control points, dependencies and transition conditions. What is the next step with the available resources?

Example: Agree data → learn → collect log → check.

M09 / Resources

People's time, playground, materials, equipment and physical energy are separate. Is the availability of the resource for the desired period confirmed?

Example: A mentor, workplace, computer or paper form.

M10 / Finance

Plan and fact of expenditure, source, spending authority and documents. What amounts are confirmed and what are estimated?

Example: The limit is agreed in the pilot’s estimate; the money received is not expected.

M11 / Law and Security

Grounds of work, availability, risks, tolerances and stopping criteria. What is prohibited to continue regardless of the expected benefit?

Example: There is no interference with the electrical installation; in case of danger, work is stopped.

M12 / Data and evidence

Sources, Units, Methods, Quality, Access, Storage, and Output Limitations. Is there enough data for the stated result?

Example: Primary log, calculation version, verification act, pass list.

M13 / Acceptance and continuation

Who checked what is accepted, what is not proven, the revision period and the next cycle. What are the reasons for applying or updating the standard?

Example: Status for each criterion; comments; responsible and new date.

Rule of completeness

A completed passport does not mean a work permit. Critical conditions must be confirmed, not just listed. In the absence of a legal basis, admission or a safe method, performance does not begin.

08 / REQUIREMENTS

How to describe the test criteria

Criterion format: object + observed action or property + Unit or descriptive heading + threshold + Terms and Conditions + Term + Method + rule of decision. Not every useful quality needs to be expressed in numbers, but every conclusion requires an explicable basis.

Weak wording

Working language

"Quality training"

The participant independently fills out the training journal, performs the calculation and explains two data limitations on the pre-issued criteria sheet.

“Energy is used perfectly”

Specific consumption for the agreed period is not above the target value under comparable regime; safety and quality of conditions are not deteriorated.

"The knowledge base is complete"

For each card included, the source, date, authorship, rights, method, limitations, and version are filled in; exceptions are shown separately.

“The community is stronger.”

The participants received a clear order of joint work and appeals; the fact of its use and comments are reflected in the protocol.

Three groups of requirements

Mandatory conditions - right, security, data and other prohibitions on continuation. Acceptance requirements are qualities without which the declared result is not fulfilled. Directions of improvement are desirable qualities of the next cycle. The group of each criterion is fixed before the result is obtained.

Four verification statuses

Achieved; not achieved; insufficient data; not applicable to justification. For a mandatory condition, "data is not enough" is not equally "allowed". The average of several successful criteria does not cover the failure of a critical requirement.

Achievement is not ideal

The result may correspond to the selected version and at the same time have restrictions. These restrictions are included in the standard, and not hidden in the notes.

09 / EVIDENCE

Check compliance and check benefits

The engineering methodology distinguishes between verification - confirmation of compliance with specified requirements - and validation - confirmation of suitability for the expected application. The constructor uses both questions: "Made according to the conditions?" and "Does this solve the agreed user problem?". [S02]

Object of verification

Suitable material

Limitation

Skill

Independently completed task and a list of criteria.

Self-reporting and attendance do not replace the work pattern.

Process

Observing multiple executions, log of deviations.

One lucky case does not prove sustainability.

Physical size

Method, instrument, conditions, primary data and quality assessment.

The number without unit and conditions is not suitable for comparison.

User suitability

Real-world verification and feedback.

The opinion of a limited group cannot be considered as the opinion of all.

Expense

Confirmation documents and reconciliation of the plan with the fact.

The promised funding is not equal to the money received.

Measurement quality and withdrawal limits

Metrological traceability links the measurement result to the support through a documented calibration chain, taking into account uncertainty. This is not the same as a digital file history. The procedure required is determined by the type of measurement and the applicable regulations. [S10, S09]

Each check records the omissions, changed conditions and possible sources of error. When the uncertainty range crosses the threshold, a positive opinion is not automatically issued: a pre-agreed rule is applied or additional data is collected.

Chain Break

Source → method → data → calculation → conclusion. If one link is missing, the withdrawal status is reduced to "data is not enough" or "hypothesis".

10 / CONTROL LIST

20 checks before applying the standard

Q01-Q20 is the proposed designer's checklist. These are not requirements of an international standard or an assessment of personality. The non-applicability of the paragraph requires a short explanation; blocking comments are closed before the start.

Code

Group

Verification

Q01

Use

The need is confirmed by the participant or the owner of the task.

Q02

Use

A person can choose a route, pause and exit.

Q03

Use

The boundaries of the object, period, and group are clearly described.

Q04

Use

The initial state is separated from the desired result.

Q05

Use

The criteria are clear to the user and the examiner.

Q06

Feasibility

The necessary knowledge, method and mentor are available.

Q07

Feasibility

Resources are confirmed; there is no double promise of one resource.

Q08

Feasibility

Time and load agreed with the performers.

Q09

Feasibility

The financial plan has a basis and is responsible.

Q10

Feasibility

Roles, powers and dependencies are defined.

Q11

Security

Legal grounds and mandatory requirements are identified.

Q12

Security

Risks, stop conditions and response procedures have been identified.

Q13

Security

The availability and absence of coercion are taken into account.

Q14

Security

Rights to materials and data regime are established.

Q15

Security

Side effects in related directions have been tested.

Q16

Evidence

For the criterion, units, method and decision rule are specified.

Q17

Evidence

Periods and conditions are comparable or differences are explained.

Q18

Evidence

Data, calculations and restrictions are available to the verifier.

Q19

Evidence

The result is not only verified by its author.

Q20

Evidence

The version, revision period and correction channel are assigned.

The form of verification shall indicate the status, proof, comment, responsible and term. The result is a specific decision on the project: allow, modify, suspend or complete.

11 / 19 DIRECTIONS

Man, knowledge and natural basis

The D01–D19 numbering is retained from the FENIX programme. Typical benchmarking objects are proposed below; specific thresholds and permits are selected for each project.

D01 / People and Health

Reference: Affordable and safe practice. Agreed mode of participation, clear route of specialized care and the absence of unauthorized medical interventions.

Confirmation: Map of barriers; adaptation protocol; feedback. Border: Do not evaluate the value of a person and do not replace treatment with a learning route.

D02 / Education and knowledge

Reference: Repeated training module. The participant performs an agreed task, explains the method and can use the material without hidden conditions.

Confirmation: Sample work; criteria sheet; sources and rights. Border: Attending a class by itself does not prove a skill learned.

D03 / Natural climate

Reference: Passport of local climate risk. Observations are time-bound; the proposed measures are consistent with the vulnerability studied.

Confirmation: Log; map; description of the season and withdrawal limits. Border: Local observation does not prove global climate change.

D04 / Land and soil

Reference: Training area with comparable observations. There is an agreed site, method of selection and initial description of the soil and the site regime.

Confirmation: Passport of the site; scheme of points; results of profile analysis if necessary. Border: Do not transfer conclusions from one site to the entire territory.

D05 / Water

Reference: Clear water accounting. Volumes and losses are different; the resolved leakage is confirmed before and after under comparable conditions.

Confirmation: Indications; act; object mode log. Border: Saving water does not confirm the quality of drinking water.

12 / 19 DIRECTIONS

Environment, power, energy and materials

The D01–D19 numbering is retained from the FENIX programme. Typical benchmarking objects are proposed below; specific thresholds and permits are selected for each project.

D06 / Air

Reference: Checkable map of the premises. Specifies the destination of the sensor, location, time and conditions; the limits of the method are communicated to the user.

Confirmation: Testimonial log; device information; profile check if necessary. Boundary: Household surveillance is not equal to the laboratory conclusion.

D07 / Biocenoses

Reference: Reproducible map of observations. The type, place, date and method are recorded; the environmental action is consistent with the regime of the territory.

Confirmation: Observation cards; route; photo with permissible disclosure of coordinates. Border: Do not interfere with protected habitats without a reason.

D08 / Food

Reference: Traceable learning food chain. The origin, storage and distribution of the product are described; safety is checked by type of activity.

Confirmation: Party log; storage conditions; documents of the performer. Border: The training project does not waive sanitary requirements.

D09 / Energy

Reference: Energy passport of the object. The energy is taken into account within the specified limits; the comparison takes into account the mode of operation and significant factors.

Confirmation: Journal; units; calculation; uncertainty and limitations. Boundary: The estimated potential is not declared as measured savings.

D10 / Materials

Reference: Material passport and testing. Composition, batch, assignment and required properties are defined; the verification method corresponds to the task.

Confirmation: Test report; sample ID; conditions. Border: Ceramics and synthetic crystals are not interchangeable without checking the properties.

13 / 19 DIRECTIONS

Production, infrastructure and science

The D01–D19 numbering is retained from the FENIX programme. Typical benchmarking objects are proposed below; specific thresholds and permits are selected for each project.

D11 / Industry

Reference: Repeated production process. The output, technological conditions, quality and safety limitations are set before performance.

Confirmation: Process map; party log; act of control. Boundary: A single successful sample does not confirm serial stability.

D12 / Transport

Reference: Route with proven conditions of use. Availability, time, resource and route constraints are described for a specific group and period.

Confirmation: Map; time log; check conditions. Border: The promised time does not replace the actual availability.

D13 / Cities and settlements

Reference: Available site or environment object. Owner, permitted mode, users and barriers are known; changes are agreed.

Confirmation: Measurements; user route; works acts. Border: The improvement scheme does not replace the project and permits.

D14 / Science

Reference: Reproduced research protocol. The question, hypothesis, method, initial data and conditions of repetition are published to an acceptable extent.

Confirmation: Protocol; data; calculation; limitations and negative results. Boundaries: The hypothesis is not declared to be an established scientific result.

D15 / Digital Environment and AI

Reference: Verifiable digital function. Purpose, access rights, log of actions, test cases and manual correction method are defined.

Confirmation: Test protocol; versions; error log and access. The answer AI is not an independent proof.

14 / 19 DIRECTIONS

Resources, community and governance

The D01–D19 numbering is retained from the FENIX programme. Typical benchmarking objects are proposed below; specific thresholds and permits are selected for each project.

D16 / Economics and Finance

Reference: Transparent resource and monetary plan. The plan is separate from fact, obligation from revenue, and in-kind contribution from money.

Confirmation: Estimate; contracts; primary documents; reconciliation. Border: Do not summarize rubles, hours, energy and human qualities.

D17 / Social system

Standard: Affordable voluntary service. The conditions for participation, support, treatment and withdrawal are clear; feedback does not entail sanctions.

Confirmation: Rules; impersonal feedback; log of appeals. Border: Do not build a social rating of families or participants.

D18 / Security and Sustainability

Reference: Proven procedure for actions in case of failure. Risks, stop conditions, responsible and job recovery are set and tested in a safe way.

Confirmation: Risk log; training check; elimination protocol. Border: Zero incident records does not prove no risk.

D19 / Development Management

Reference: Transparent cycle of project solutions. There are powers, criteria, evidence, protocol and the possibility of reviewing the decision on the project.

Confirmation: Register of decisions; versions; execution and motivated remarks. Border: The project procedure is evaluated, not the person’s political views or choices.

Related Areas

The main direction determines the owner of the task. Additional links note the impact on knowledge, resources, security, and the environment. They do not create multiple copies of the same effect.

15 / RELATED BALANCES

From reference to change of state

The standard specifies what change is considered necessary and acceptable. Balance describes the need, presence, deficit, action, and confirmed change in certain units. Multiple balances may be required for a single project, but the result is not multiplied by the number of links.

Recording

What to fix

Need and initial condition

Object, period, units, source and confirmed deficit.

Resource and Action

Resource owner; availability; limitations; actual contribution; work.

Reference and fact

Target state; actual value; comparison method.

Inter-directional communication

From which D-code to which; type of influence; expected sign; proof.

Result of the decision

Improvement, deterioration or lack of data; responsible for the following action.

Matrix 19 × 19

At the intersection of directions, a description of the connection is stored, not an arbitrary universal score. Example: reducing energy consumption D09 requires air impact testing D06, availability D01 and safety D18. Savings in case of deterioration of critical conditions are not accepted as a fulfilled standard.

Working interpretation of KRISTALL741

For this module, a display is offered: 3 Layer "image - reference - fact" × 19 Directions × 13 Fields = 741 structural position. This is an information model for reconciliation, not a proven law of nature. Structure does not require filling everything 741 positions for each small project.

Matrix 13 × 20 Connecting Fields M01–M13 with checks Q01–Q20. The cell contains a reference to proof or justification of non-applicability; it does not add new personal contours.

Units do not mix

Rubles, watches, kW·h, water volume and descriptive qualities are stored separately. The balance sheet is not equal to the accounting recognition of the asset.

16 / EXAMPLE: KNOWLEDGE

The Open Learning Module

A training example. The site wants to prepare a selection of 20 cards for self-filling the energy log. All the numbers below are fictional to demonstrate the methodology.

Layer

Contents

Image

The beginner understands the task, performs the action and knows where his competence ends.

Reference

Each published card has a source, authorship, usage rights, steps, restrictions, version, and checker. Two users independent of the author go through the script.

Example fact

20 cards have been produced; 18 have been verified; no illustration rights have been established for the two. One of the two test users could not repeat the calculation without a hint.

Decision on examples of criteria

The eligibility criterion for the entire claimed kit has not been met. The criterion of self-repetition by two test users is also not fulfilled. "18 out of 20 is ready" describes the amount of readiness, but does not turn the whole kit into accepted. It is allowed to separately accept 18 cards as a clearly reduced volume after agreeing on a new version.

Next Action

Replace two illustrations or get permission. Refine the calculation instructions. Repeat the user check. In the Archive, save both the original version and the list of corrections; do not erase the fact of a failed attempt.

For open educational resources, UNESCO links reuse to the public domain or open license. Free access to the page by itself does not confirm the right to process its materials. [S05]

The Meaning of Knowledge

Not the number of files, but the ability to understand, legally use, safely repeat and verify a specific action.

17 / EXAMPLE: ENERGY

A comparison that does not hide the conditions

Training calculation for a conditional workshop. Main direction D09; Communications D02, D06, D15 and D18. The purpose of the example: specific consumption not higher 18 KW·h per hour of operation under comparable conditions and without deterioration of safety.

Indicator

Baseline

Verification period

Electricity

2 400 kW·h

1 900 kW·h

Opening hours

120 ч

100 ч

Specific consumption

2 400 / 120 = 20 kWh/h

1 900 / 100 = 19 kWh/h

Change in total flow

—

(2 400 − 1 900) / 2 400 = 20,8%

Change in specific flow rate

—

(20 − 19) / 20 = 5,0%

What can I say

The total cost is less than the 500 KW·But the hours of work have also decreased. After a simple normalization of time, the decrease is 5%. Target threshold 18 KW·h/h not achieved: actual value equals 19. Neither attendance nor weather nor load composition in this example is measured.

What not to say

It is not possible to declare all 20,8% confirmed savings from the event. It is impossible to withdraw financial savings without a tariff and calculation conditions. Normalization is not sufficient only by the hour when other factors are significant; in this case, the causal effect remains unconfirmed.

The ISO 50001 is used as a benchmark for setting energy goals, working with data, and verifying improvements. Calculation here is your own educational illustration, not a certification procedure. [S04]

Summary of Example

The target expenditure requirement is not met. Reasonable savings - data is not enough. The next step is to check for significant factors and safe measures, rather than reversing the target.

18 / FULL PASSPORT

Workshop of knowledge: design and standard

Demonstration passport FEN-ET-D02-001, Version 0.1. This is a project example, not information about the open site. The purpose is to learn how to keep records of resources without performing dangerous engineering work.

Field

Complete example

M01 / Identification

"A workshop of understandable energy consumption". Code FEN-ET-D02-001. Version 0.1. Status: Project.

M02 / Need

Participants want to read the allowed readings, keep a journal and explain their calculation. Prior to recruitment, the need is confirmed by a short conversation.

M03 / Participants

The curator of the center is the owner of the task. The teacher is an escort. A group of adults are performers. The examiner is not the author of the final calculation. Names are assigned separately.

M04 / Borders

One agreed platform; log only permitted data. The proposed cycle is 12 weeks. Electrical installation, repair, testing of hazardous devices and access to electrical panels are excluded.

M05 / Directions

Main D02. Contacts D09, D15 and D18. Personal contours by choice: P03, P05, P06. The remaining contours are not evaluated.

M06 / Knowledge

Concepts of energy and power; reading data; log; calculation; distinguishing between total and specific flow; output limits. Sources and rights are recorded in the cards.

M07 / Results

Ideal image: a person understands resource accounting. Operating standard: agreed log, reproducible calculation, explanation of constraints and safe transmission of instruction. The initial skill is checked by the training task.

The number of a specific group, premises, devices and financing are not supposed to be substituted here. They are included in the operator's decision after checking the available conditions.

19 / FULL PASSPORT

Knowledge Workshop: Resources and Acceptance

Field

Complete example

M08 / Plan

Weeks 1–2: inquiry and rules. 3–4: benchmark and training. 5–8: log and calculation. 9–10: recheck. 11–12: acceptance, archive and next step.

M09 / Resources

Mentor; available materials; permitted source of readings; workplace; computer or paper form. The permissible load is agreed personally.

M10 / Finance

Costs are included in the agreed cost estimate of the common pilot; before approval, the amounts have the status of "not defined". Income and expenses are confirmed by documents.

M11 / Law and Security

Consent of the site owner to access the data; rules of participation; safe instruction; data mode. In the absence of authorized access or the occurrence of danger, the action is terminated.

M12 / Data and evidence

Log with dates; units; mode description; saved formulas; criteria sheet; verification comments. Personal contacts are kept separate from the published sample.

M13 / Acceptance and continuation

For each requirement, status and proof are recorded. Corrections are reviewed again. Acceptance of the educational result does not confirm engineering savings or professional qualifications.

Example of workshop acceptance conditions

The journal refers to a known object and period. Each value has a unit and a source. The calculation is repeated on the provided data. The participant explains the limitations. There are no unauthorized technical actions. The publication defines the rights and excludes unnecessary personal data.

Two independent results

The learning task is checked on the participant’s work. The energy effect is checked by the measurements of the object. One result does not replace another.

20 / DIGITAL ARCHITECTURE

Designer as a working system

The first version can be maintained in folders and tables without waiting for a complex platform. The digital interface must retain the same logic: Question → passport → action → proof → solution. Automation does not change the status of the source data.

Module

Minimum function

Request Card

Select the object, the desired use, the main D-direction and boundaries.

Reference Editor

Fill in M01 to M13; bind criteria; show missing fields.

Checks Q01-Q20

Collect evidence; assign comments and blocking conditions.

Practice and resources

Fix work, load, plan and expense fact.

Evidence

Store source, method, date, version, access, and restrictions.

Acceptance and Versions

Compare the fact with the agreed version; formalize the decision and review.

Heritage Preservation Archive

Transfer verified materials with origin, rights and history of changes.

Six Logical Registers

ET - standards; CR - criteria; EV - evidence; PR - projects and routes; BL - balance sheet connections; RV - tests and versions. These are proposed internal record types, not a replacement for previously created legal registries. Each record must have an identifier, owner and date.

Role EQUILIBRIUM

It is proposed to use EQUILIBRIUM to monitor communications, data quality and execution. FENIX organizes training and practice, and the Archive maintains the results. This is the distribution of functions within the concept; the existence of working integrations is not claimed.

21 / QUALITY MANAGEMENT

Roles, Versions and Corrections

Role

What is responsible for

What he doesn’t do alone

Participant / owner of the request

The need, choice of route and suitability of the result.

You don't have to disclose your privacy for admission.

Author of the standard

Requirements, boundaries, method and communication with sources.

Does not independently declare its work verified.

Mentor / Performer

Training, practice, journal and early risk communication.

Doesn't change the criteria after a failed test.

Reviewer

Verification of evidence and reasoned conclusion.

It does not draw conclusions beyond its competence.

Operator / Curator

Authority, security, resources, data and referrals.

It does not eliminate the mandatory rules by an internal decision.

Recording Life Cycle

Project → is agreed for pilot → tested under specified conditions → applied with restrictions → revised → archive. The status "verified" refers to a specific version, object, and period. With the new application, portability is checked, and the conclusion is not copied automatically.

Version change

Changing a goal, criterion, method, or boundary requires a new alignment. The correction of a typo is reflected in the journal without replacing the old result. The application contains the reason, the affected records, the author, the decision and the date of the re-examination.

AI in constructor

Proposed functions AI: search for gaps, offer wording, compare versions and prepare drafts. Sources and calculations are checked by a person. NIST AI RMF 1.0 — Voluntary Guidance for Risk Management AI, not a quality certificate of a particular systemS06]

22 / RUSSIAN PART

Legal conditions of application

The specific mode depends on the operator's actions, type of data, equipment, site and services. This page is a training navigation, not a legal opinion on a particular organization.

Question

What to check before launch

Reference source

Working with data

Purpose and legal basis; sufficiency of the volume collected; access; storage; security; participant rights; publication and transfer mode.

152-FZ. [S07]

Format of training

Distinguish between education, training on the program and the provision of other services; check the licensing and legality of the issued document.

273-FZ. [S08]

Measurements

Determine whether the task belongs to a regulated area; establish requirements for the method, measuring instruments and confirmatory procedures.

102-FZ. [S09]

Site and technical works

Confirm the powers of the owner and the performer, the admissibility of works, technical and industry requirements.

A separate list for a specific object.

Acceptance and publication

Determine who accepts the work; what rights are transferred; what is disclosed; what remains restricted.

Contracts and applicable rules on outcome and materials.

Internal document does not replace external status

The name "reference", "center" or "evolutionary system" does not confirm registration, license, accreditation, government support or certification. The project acceptance certificate fixes the internal solution within its boundaries; mandatory external procedures are checked separately.

For a real launch, it is necessary to check the applicable version of the rules, the date of entry into force of the changes, regional and industry requirements. Available texts of laws in the reference system are used in the preparation; no full legal audit was conducted.

23 / INTERNATIONAL PART

Comparability without confusion of statuses

The international part of the constructor is a common language for describing knowledge, requirements and evidence. It does not create a single jurisdiction and does not confirm the recognition of the standard by a foreign partner.

Landmark

What is it used for

What does not follow

ISO: Quality principles

Understand processes, improve them, and build on data. [S01]

Automatic compliance with the standard or certification.

NASA: Verification and suitability

Separate compliance and utility in the scenario. [S02]

All engineering regulations NASA are mandatory.

BIPM / JCGM: metrology

Correctly designate measurements, benchmarks and traceability. [S03, S10]

Recognition of the project card as a means of metrological support.

ISO 50001: energy management

Build a cycle of accounting, objectives and verification of energy performance. [S04]

Confirmed savings or technology approval.

UNESCO: Open resources

Take into account the rights to access, adapt and exchange educational materials. [S05]

The freedom to copy any material found.

NIST AI RMF 1.0

Organize consideration of risks of use AI. [S06]

Legal guarantee or approval of a specific product.

Exchange card with partner

Indicates the country and parties, the purpose of the material, version, language, units, method, conditions of repetition, rights of use, data mode and the procedure for recognizing the result. Differences in local conditions are recorded by the appendix. With legally significant cooperation, the right of both parties and a specific operation are separately checked.

Exchange Rule

Not only the sample of the result is transmitted, but also the conditions under which it is received. Retesting in the new context remains a necessary project step.

24 / IMPLEMENTATION

Designer pilot for 12 weeks

The module is embedded in the previously proposed scenario FENIX: 3 center, 60 participants, 6 mentors and 6 projects. These parameters remain a calculation model, not a confirmed set. A new network and additional budget are not automatically assumed.

Period

Work

Verified exit

Weeks 1–2

Appoint an operator and responsible; confirm requests, sites, data and secure tasks.

6 applications; map of restrictions; decision on readiness of preparation.

Weeks 3–4

Prepare passports, criteria and sources; conduct training analysis.

6 versions of benchmarks; initial tasks; Q01–Q20.

Weeks 5–8

Perform limited work; keep journals; deal with difficulties.

Primary data and samples; actual costs; comments.

Weeks 9–10

Repeat the check, including the user and non-author verification.

Statuses of criteria; limitations; list of corrections.

Weeks 11–12

Make acceptance or revision; save experience and determine the next cycle.

6 protocols; archival cards; decision to repeat or terminate.

Proposed module performance criteria

For all 6 selected projects, there is a passport, criteria and a named responsible. For each significant conclusion, proof is available or its drawback is directly indicated. All blocking comments have been cleared; the number of incidents is not hidden. At least one result is repeated by another performer under the stated conditions; this is a hypothesis for the pilot, not the promised outcome.

Reason for continuation

The reproducibility of the methodology, the actual load, the reasons for the exit of participants, the quality of feedback and the closure of risks are taken into account. The large number of completed forms does not in itself indicate an improvement. The solution can be "continue", "simplify", "repeat" or "complete".

25 / WORKING FORM F-ET-01

The passport of the standard - the idea

Project Name: ______________________________ Code: __________________ Version: __________

Status: Project/Agreed for Pilot/Verified/Revised/Archive. Owner: __________________

Field

To fill

M01 / Identification

Name, code, version, date and status of the reference.

_________________________________________________________________
_________________________________________________________________

M02 / Need

Whose task is solved, what benefits are expected and how the request is confirmed.

_________________________________________________________________
_________________________________________________________________

M03 / Participants

Operator, task owner, executors, mentor and examiner.

_________________________________________________________________
_________________________________________________________________

M04 / Borders

Object, territory, group, period, conditions of use and exclusion.

_________________________________________________________________
_________________________________________________________________

M05 / Directions

One main direction D01–D19, related directions and selected personal areas P01–P13.

_________________________________________________________________
_________________________________________________________________

M06 / Knowledge

The necessary skills, sources, methodology, mentoring and rights to materials.

_________________________________________________________________
_________________________________________________________________

M07 / Results

Ideal image, working standard, initial state and acceptance criteria.

_________________________________________________________________
_________________________________________________________________

The unknown is marked "undefined". For an inapplicable field, a reason is given. Evidence and approvals are attached by identifiers.

26 / WORKING FORM F-ET-01

Passport of the standard - execution

Project Name: ______________________________ Code: __________________ Version: __________

Status: Project/Agreed for Pilot/Verified/Revised/Archive. Owner: __________________

Field

To fill

M08 / Plan

Steps, deadlines, control points, dependencies and transition conditions.

_________________________________________________________________
_________________________________________________________________

M09 / Resources

People's time, playground, materials, equipment and physical energy are separate.

_________________________________________________________________
_________________________________________________________________

M10 / Finance

Plan and fact of expenditure, source, spending authority and documents.

_________________________________________________________________
_________________________________________________________________

M11 / Law and Security

Grounds of work, availability, risks, tolerances and stopping criteria.

_________________________________________________________________
_________________________________________________________________

M12 / Data and evidence

Sources, Units, Methods, Quality, Access, Storage, and Output Limitations.

_________________________________________________________________
_________________________________________________________________

M13 / Acceptance and continuation

Who checked what is accepted, what is not proven, the revision period and the next cycle.

_________________________________________________________________
_________________________________________________________________

The unknown is marked "undefined". For an inapplicable field, a reason is given. Evidence and approvals are attached by identifiers.

27 / WORKING FORMS F-ET-02 AND F-ET-03

Criterion and verification protocol

F-ET-02 / Criterion card

Field

Filling

Criterion code; reference; version

________________________________________________
________________________________________________

Object and test property

________________________________________________
________________________________________________

Group: mandatory / acceptance / improvement

________________________________________________
________________________________________________

Initial state; source

________________________________________________
________________________________________________

Purpose; unit; conditions and period

________________________________________________
________________________________________________

Method; decision rule; uncertainty

________________________________________________
________________________________________________

Evidence; responsible; date

________________________________________________
________________________________________________

F-ET-03 / Acceptance protocol

Item: _____________________ Reference and version: _____________________ Date: ______________

Criterion

Fact / Proof

Status

Note / deadline

__________

____________________

____________

__________________

__________

____________________

____________

__________________

__________

____________________

____________

__________________

__________

____________________

____________

__________________

Statuses: Done / not done / not enough data / not applicable with justification.

Solution and scope: __________________________________________________________
Limitations and reasons: __________________________________________________________________
Checker: __________________________ Participant / Task Owner: ______________________
Review channel and recheck date: ______________________________________________

28 / WORKING FORMS F-ET-04 AND F-ET-05

Version modification and related balance

F-ET-04 / Application for change of reference

Field

Filling

Code; original version; author; date

________________________________________________
________________________________________________

What is changing and why

________________________________________________
________________________________________________
________________________________________________
________________________________________________

What requirements and relationships are affected

________________________________________________
________________________________________________

Transfer risks and re-checking required

________________________________________________
________________________________________________
________________________________________________
________________________________________________

Who agreed; new version; date

________________________________________________
________________________________________________

F-ET-05 / Balances communication card

Field

Filling

Project; main D-code; linked D-code

________________________________________________
________________________________________________

Object, period, units and source

________________________________________________
________________________________________________

Need → Resource → Action

________________________________________________
________________________________________________

Objective and actual change

________________________________________________
________________________________________________

Side Effect and Proof

________________________________________________
________________________________________________

Double counting is excluded as

________________________________________________
________________________________________________

Decision; responsible; next term

________________________________________________
________________________________________________

Minimum set

Passport + criteria + primary evidence + protocol. Forms of change and connections are added as needed. No need to create a workflow more than the task itself.

29 / SOURCES

Methodological and legal support

Date of preparation and access to the available pages: 17 September 2026. References clarify concepts. Architecture 13 / 19 / 20, forms, examples and internal procedures - project proposals FENIX, and not the requirements of the listed organizations.

S01 / ISO. Quality management principles

Methodological guidance: process approach, improvement and data-based solutions. An open description of the principles is used, not the full text of the standard or a certification statement.

Open Source

S02 / NASA. Systems Engineering Handbook, § 5.0 Product Realization

Distinguish between checking compliance with requirements and checking the suitability of the result for real application. Industry engineering source; its rules do not become mandatory for FENIX automatically.

Open Source

S03 / JCGM / BIPM. VIM, § 5.1 Measurement standard

Technical significance of the standard in metrology. The design standard FENIX is not declared as a unit of value standard.

Open Source

S04 / ISO. ISO 50001 — Energy management

Open energy management review: data, objectives, measurement and improvement. The numbers in the kit are a training example, not a confirmed savings.

Open Source

S05 / UNESCO. Recommendation on Open Educational Resources, 2019

Educational materials in the public domain or under an open license. The conditions of access, translation and reuse must be checked with the specific material.

Open Source

Status of materials

Open official methodical pages of international organizations and texts of laws in the reference system are used. Full paid standards have not been reproduced. References do not mean partnership, verification of the project by the specified organization or its approval.

30 / SOURCES

Sources and continuity

Date of preparation and access to the available pages: 17 September 2026. References clarify concepts. Architecture 13 / 19 / 20, forms, examples and internal procedures - project proposals FENIX, and not the requirements of the listed organizations.

S06 / NIST. Artificial Intelligence Risk Management Framework (AI RMF 1.0), 2023

Voluntary risk management framework AI. The kit uses this version as a methodological reference, without a statement of compliance or approval NIST.

Open Source

S07 / Federal Law No. 152-FZ of 27.07.2006 “On Personal Data”

Available text of the law in the reference legal system. The purpose and basis of processing, the rights of participants, security and data transfer mode are checked for launch.

Open Source

S08 Federal Law of 29.12.2012 № 273-FZ "On Education in the Russian Federation"

Available text of the law in the reference legal system. Education, educational activities, licensing and education documents differ; applicability depends on the actual format.

Open Source

S09 Federal Law of 26.06.2008 № 102-FZ "On ensuring the uniformity of measurements"

Available text of the law in the reference legal system. The scope of state regulation, methods and means of measurement and the required procedures are checked; the project card does not replace them.

Open Source

S10 / JCGM / BIPM. VIM, § 2.41 Metrological traceability

The metrological traceability of the measurement result and the chain of calibrations with contribution to uncertainty. Not identical to the link to the file or the history of changes to the document.

Open Source

Internal basis

"FENIX — The evolutionary system. Knowledge and energy”, working concept 1.0; Fenix_Evolution_Program_v file1.docx provided in this work. It is preserved from D01–D19, P01–P13, sequence 13 Sections and pilot model. Image FENIX taken from a previously prepared illustration of the user; a fragment without text promises is used.

Readiness for use is confirmed for a specific operator and project. Not defined in the document details, powers, sources of funds and partnerships are not considered established.